നിലവിലെ താരീഫ് നിരക്കുകള്
|
Tariff Structure |
Existing Tariff
|
I-Phase Energy
Charges(Rs/kWh) |
Fixed Charges |
III-Phase Energy Charges
(Rs/kWh) |
Fixed Charges |
Lifeline Connection |
1.60 |
Rs. 10/- per kW per month or part thereof |
---
1.60 |
Rs. 10/- per kW per month or part thereof |
Domestic |
0-100 units |
3
|
Rs.
25 /- per kW per month or part thereof for single phase
|
3
|
Rs.
25/- per kW per month or part thereof for three phase
|
101-200 units |
4.5
|
4.5
|
201-300 units |
6.5
|
6.5
|
301 units & above |
8.5
|
8.5
|
Commercial
|
0-100 units |
10
|
Rs.
35/- per kW per month or part thereof for single phase |
10
|
Rs.
35/- per kW per month or part thereof for three phase |
101-200 units |
11.5
|
11.5
|
201 units and above |
15
|
15
|
Gov. Consumers
|
0-200 units |
14.00
|
Rs.
45 per kW per month or part thereof for single phase |
14.00
|
Rs.
45/- per kW per month or part thereof for three phase |
201 units and above |
15.30
|
15.30
|
HT(High-Tension) Consumers
|
13.15
|
Rs.
200
/kVA/month |
13.15
|
Rs.
200
/kVA/month |
Industrial
|
10
|
Rs.
65
/kVA/month |
10
|
Rs.
65
/kVA/month |
Public Lights
|
10.8
|
Rs.
90
/kVA/month |
10.8
|
Rs.
90
/kVA/month
|
Temporary Connections
|
1.5 times the rate applicable to the relevant category of consumers
|
1.5 times the rate applicable to the relevant category of consumers
|
Air Conditioner
Surcharge
|
--
|
--
|
Meter Rent Charges
|
10 |
25 |
Reconnection Initial Charges
|
Rs. 50
- I Phase |
Rs. 100
- III Phase |
Rs. 500
-
HT |
Service Connection
Initial Charges
|
Rs. 250
- I Phase |
Rs. 500
- III Phase |
Rs. 1000
-
HT |
BPSC (%)
|
1.5 |
1.5 |
Meter Testing Charges
|
Rs.
100 |
Rs.
300 |
Meter Card
|
-- |
-- |
Meter shifting charges (within the premises on consumer request, if service cable is not required to be changed)
|
Rs.
100
|
Rs.
100 |
Meter shifting charges (within the premises on consumer request, if change in service cable required up to 30 metre)
|
Rs.
200
|
Rs.
200 |
Shifting of Poles (On
request)
|
Rs.
1500 |
Rs.
1500 |
Diversion of LT/HT Line
|
Rs.
100/meter |
Rs.
100/meter |
Penalty for tampering/damaging of supplier
equipment
|
As per the relevant provisions of
the JERC Supply Code
Regulations, 2018 |
As per the relevant provisions of
the JERC Supply Code
Regulations, 2018 |
Installation Testing
charges
|
Rs. 10
- I Phase D |
Rs. 50
- I Phase C |
Rs. 50 Public |
Rs. 25
- III Phase D |
Rs. 100 - III
Phase C |
Rs. 250
- III Phase I |
Rs. 50 Public |
|
|
|
|
|
|